ROADS

Road network is a crucial catalyst of development. Most road network in Kabondo Kasipul Constituency are murram  with a fair coverage of roads of gravel and earth surface. Various roads and are in poor conditions and worsen during the rainy season,encroachment on road reserves and inadequate funding are the major problems.

In partnership with KeRRa and KURA, our office have prioritized road construction in all the wards across the constituency, to enhance access, enable free movement of goods and services, and ensure, periodically, they are in the right state.

 

 

 

The following roads are completed, ongoing, and upcoming.

ACTIVITIES

WARD

ROAD

DONE BY

STATUS

KM

KOJWACH

Juntion – Dudi

NG-CDF

Complete

2.3

Ogera – Apondo

NG-CDF

Complete

 

Ringa Kojwach-Keya Bridge-Tala health centre- Ang’ino

KeRRA

Complete

3.0

KOKWANYO KAKELO

 

 

Kachieng’ Bongu – Nyabondo – Mikai

KeRRA

Complete

4.1

Kogoya – kochola     

KeRRA

Complete

 

Omiro- Kocholla

KeRRA

Complete

 

KABONDO WEST

Nyandolo – Ramula

KeRRA

Complete

2.7

Kadongo – Osuri -kibuon  

KeRRA

Complete

15

Ogilo – Odino ring

KeRRA

Complete

1.8

Misambi – Karota

KeNHA

Ongoing

 

Chagere – Kilusi

NG-CDF

Complete

 

KABONDO EAST

Wang’apala –  Nyadolo

KeRRA

Complete

4.6

Nyapalo – Nyamwaga .

KeRRA

Complete

2.9

Misambi – Siany – Omuga road

KeRRA

Complete

1.9

Narrow gate – Junction Lwanda road- Dago Kowuor   

KeRRA

Complete

16

Wangala – oogo     

KeRRA

Ongoing

 

Dago – ponge              

KeRRA

Complete

 

Ramula sondu bridge

keRRA

Complete

 

Anjech – Wangapala

NG-CDF

Ongoing